Monday, November 30, 2015
Sunday, November 29, 2015
Friday, November 27, 2015
Tuesday, November 24, 2015
Sunday, November 22, 2015
Tuesday, November 17, 2015
Monday, November 16, 2015
Thursday, November 12, 2015
Tuesday, November 10, 2015
Seffner Sinkhole - dirt / sand fill
Monday morning the dirt started arriving. One truckload at a time. These pictures were shot Tuesday AM by my neighbor. He said they are dumping it by the road/tree and then transporting it to the hole. I will stop by in a couple of hours to check on the progress.
We might be a day behind due to the rain. I will find out today. More later! Thanks for stopping by. Check back daily for updates.
Saturday, November 7, 2015
Seffner sinkhole is in the home stretch - hopefully
The crew has finished with filling the sinkhole with grout. Monday it will be topped off with fill dirt. Tuesday the engineers and geologists will return to take soil samples and test the ground with that fancy equipment.
I met my tenant there today to get a key to the apartment because the engineers will also have to inspect the inside for structural damage. If they deem the building safe and there is no new sinkhole action on the property, the county will remove the evacuation signs and she can move back in to her apartment.
What a long strange trip this has been.
I met my tenant there today to get a key to the apartment because the engineers will also have to inspect the inside for structural damage. If they deem the building safe and there is no new sinkhole action on the property, the county will remove the evacuation signs and she can move back in to her apartment.
What a long strange trip this has been.
Friday, November 6, 2015
I was obviously stressed. I am still in shock.
I just read some of my blog posts over the last week. Man oh man did my writing, grammar, spelling, punctuation, everything.... SUCK!
False alarm - Seffner sinkhole drama
I learned that recently filled sinkholes are steamy. To someone, steam resembles smoke. Of course that someone called Hillsborough County Fire Rescue and reported a fire at my sinkhole tonight.
Seriously.
False alarm. I'm sure Bay News 9 will be at the scene soon interviewing anyone who walks by.
Seriously.
False alarm. I'm sure Bay News 9 will be at the scene soon interviewing anyone who walks by.
Prepping for filling Seffner sinkhole
They put this plastic down every day to protect the ground and make cleanup easier. The cement truck backs up to this little hopper. The hopper is full of the foam which gets mixed with the cement and creates the grout filler.
Day 4 of filling the Seffner sinkhole
Cement mixes with the foam to create a grout that is lighter than the soil/sand currently in the yard. 20 trucks so far this week and probably 3-4 more today. They expect to be done with this process this afternoon. Next the ground is tested again. After that passes, top soil will be added and they are done.
Thursday, November 5, 2015
Ten truckloads today - grout (cement mixture) Seffner sinkhole
I've been calling the filler cement/foam for three days and they like to call it grout. Getting closer to the top.
Garage door opener died. Of course
Anything else? Please happen now so I can deal with it...
Gary is installing the new opener right now.
Gary is installing the new opener right now.
Subscribe to:
Posts (Atom)